cGMP/Building and Facility
BUILDING AND FACILITY
Any building or buildings used in the manufacture, processing, packing, or holding of a drug product shall be of suitable size, construction and location to facilitate cleaning, maintenance, and proper operations.
LAYOUT/DESIGN
PERSONNEL FLOW
LOCATION
EASY TO CLEAN
MATERIAL FLOW
HVAC
GENERAL REQUIREMENTS
Layout and design of premises
prevent/minimize
- The risk of error
- Cross Contamination
- Dust Buildup
Location of Premises
Location should be in an environment that protects the processes, materials and the product from contamination.
Requirements
- smooth easy to Clean surfaces
- Sufficient light
- HVAC facility to control temperature, humidity and ventilation.
- HVAC design and qualifications for sterile/nonsterile manufacturing, AIr Changes, Air Flow Patterns, Differential Air Pressures etc.
- Insects and pest control
- Dedicated and logical flow of materials and personnel
dedicated areas
- Facility must offer dedicated areas for
- Quarantine areas for incoming materials
- Rejected Materials and rejected finished goods areas under lock and key
- Storage of released components, drug product containers, closures, and labeling;
- Storage of in-process materials;
- Manufacturing and processing operations;
- Packaging and labeling operations;
- Quarantine storage before release of drug products;
- Storage of drug products after release;
- Control and laboratory operations;
- (Aseptic processing, which includes as appropriate
ANCILLARY AREAS
-
- Separate rest and refreshment rooms
- Easy access to facility for changing and storage of clothes and toilets
- Maintenance workshop separated from production areas
Phone
03334115785
Location
554, Sundar Industrial Estate Lahore
info@pmdconsultancy.com